A city planned by John Nolen in the 1920s
Concrete Contractors in Venice, FL
Driveways, pool decks, patios and walks for Venice homes, on the island and the mainland.
- Free on-site measuring visit
- Written, line-by-line quote
- County permit and swale culvert planned before the pour
Venice Concrete, From the Island to the Mainland
Venice is one of the few places in the region that was planned as a city from the start, and homeowners hiring concrete contractors in Venice work within that plan and the city's own right-of-way rules. Fred Albee bought 112 acres during the 1920s land boom and hired planner John Nolen, the land went to the Brotherhood of Locomotive Engineers, and the first parts of the city were built in 1925 and 1926. Venice incorporated as a town on July 1, 1926, and became a city in 1927. We pour driveways, pool decks, patios, walks and slabs here and replace concrete that has cracked, settled or been damaged by storms.
City inspection before the pour
The City of Venice handles driveway work in its right-of-way through a right-of-way use permit from Development Services, Engineering and Stormwater. Single-family driveways and curb cuts fall under the "minor" category. The city's application states that concrete forms must be inspected before the pour and that inspection requests need at least 24 hours' notice. It also requires notifying utilities through Sunshine One Call and Venice Public Works before work starts, and a paver driveway in the right-of-way needs a separate license agreement. Improvements have to follow the City Standard Details. We build those steps into the schedule so a form inspection never holds up a truck.
Storm damage from 2024
Venice was near the center of the worst storm surge and winds when Hurricane Milton came ashore just to the north, near Siesta Key, on October 9, 2024, less than two weeks after Helene pushed several feet of surge through the city. A lot of our Venice work since then is replacement: driveways cracked by debris trucks, walks lifted or undermined by water, and pool decks around pools that had to be rebuilt. We check the base under every damaged slab before deciding between repair and replacement, because surge water often leaves voids under concrete that looks fine on top.
Rain and an older population
Venice averages 51.27 inches of rain a year, with August the wettest month at about 8.34 inches, and the heaviest rain falls from June through September. We schedule pours around afternoon storms and slope every slab to shed water. The city's 2020 median age was 69.8, and nearly 63 percent of residents were 65 or older, so many of our customers here want smooth, wide walks, low or no-step entries and non-slip finishes on pool decks. We can design for that from the start.
Venice Island and the mainland
Locals call part of the mainland across the Intracoastal Waterway "Venice Island," reached by bridges over the man-made channel. The island holds the original Nolen-planned streets; the mainland side has newer subdivisions and gated communities with their own association rules. On the island we keep new work in step with older homes. On the mainland we work from your HOA's guidelines on driveway colors and finishes.
What we pour in Venice
- Driveways: replacements and new aprons built to city standard details
- Pool decks: new and replacement decks, including non-slip finishes
- Patios and lanais: slabs for screen enclosures and outdoor living areas
- Walks and entries: wide, gently sloped walks and low-step landings
- Pads: generator, AC and equipment pads
- Repairs: storm-damaged sections, settled panels and trip edges
Call (941) 206-4845 to set up a free visit in Venice.
What to Know in Venice
- Form inspection. The city's right-of-way permit requires inspection of concrete forms before the pour, with at least 24 hours' notice.
- Planned city. John Nolen planned Venice in the 1920s; the first parts were built in 1925 and 1926, and it incorporated on July 1, 1926.
- 2024 storms. Helene caused several feet of surge in Venice, and Milton made landfall just north near Siesta Key on October 9, 2024.
- Rainy season. Venice averages 51.27 inches of rain a year, mostly from June through September.

Venice Questions
Does Venice inspect driveway work?
Yes. For work in the city right-of-way, the City of Venice requires a right-of-way use permit and an inspection of the concrete forms before the pour, requested at least 24 hours ahead. We schedule it as part of the job.
Can I put a paver driveway apron in the Venice right-of-way?
The city requires a separate license agreement for a paver driveway in the right-of-way. A concrete apron built to the city's standard details avoids that step.
Can you make my entry walk easier to use?
Yes. We can widen a walk, reduce or remove a step at the door, and use a broom or textured finish for better grip. We look at the door threshold height first to see what is possible.
Free Estimates in Venice, FL
Tell us whether you are on the island or the mainland and what needs work, and we will set up a free estimate in Venice.
Concrete Contractors Near Venice
- Concrete Contractors in Port Charlotte, FL
- Concrete Contractors in Punta Gorda, FL
- Concrete Contractors in North Port, FL
- Concrete Contractors in Englewood, FL
- Concrete Contractors in Rotonda West, FL
- Concrete Contractors in Cape Coral, FL
- Concrete Contractors in North Fort Myers, FL
- Concrete Contractors in South Venice, FL
- Concrete Contractors in Venice Gardens, FL
- Concrete Contractors in Warm Mineral Springs, FL
- Concrete Contractors in Harbour Heights, FL
- Concrete Contractors in Charlotte Harbor, FL
- Concrete Contractors in Charlotte Park, FL
- Concrete Contractors in Cleveland, FL
- Concrete Contractors in Solana, FL
- Concrete Contractors in Grove City, FL
- Concrete Contractors in Manasota Key, FL
- Concrete Contractors in Placida, FL
- Concrete Contractors in Boca Grande, FL
- Concrete Contractors in Babcock Ranch, FL
- Concrete Contractors in Burnt Store Marina, FL
- Concrete Contractors in Arcadia, FL
- Concrete Contractors in Fort Ogden, FL